Yeah, the plan is to upgrade the current duoracer (which is MPPT) to a Victron 100/30 that would handle more power and provide more visibility. Was just thinking it would be really easy to add another panel and double the power with another factory PERC panel.
Installing two 200w Renogy panels appears to overlap the hand rails on my 29S more than I’d like.
That would be perfect if I had an economical way to get it to either Seattle or Phoenix.I have my original stock panel just sitting in storage here in socal if you want it. Though if you're not local I have to imagine shipping it anywhere would be less cost effective than just buying new panels.
Installed two Renogy 200W ShadowFlux panels on my R29S last spring, and they charged the batteries to absorption even in rainy Prince William Sound, Alaska, while I was anchored for days at a time. I also installed the Victron controller 100/30. The panels sit above the handrails about 8". No problem grabbing the handrails!Yeah, the plan is to upgrade the current duoracer (which is MPPT) to a Victron 100/30 that would handle more power and provide more visibility. Was just thinking it would be really easy to add another panel and double the power with another factory PERC panel.
Installing two 200w Renogy panels appears to overlap the hand rails on my 29S more than I’d like.
That looks interesting! How sturdy is the xr100 connection to the Gemini mounts? Would love any more pictures of how the XR100 rail is mounted. I assume the two panels side by side are too wide to mount to the factory cross bar using just the Gemini mounts?Installed two Renogy 200W ShadowFlux panels on my R29S last spring, and they charged the batteries to absorption even in rainy Prince William Sound, Alaska, while I was anchored for days at a time. I also installed the Victron controller 100/30. The panels sit above the handrails about 8". No problem grabbing the handrails!
Dirk Sisson
Anchorage, AK
View attachment 28364
I used Gemini hinged split side rail mounts and IronRidge Solar Racking and Mounts for the installation. The IronRidge parts included the XR100 Rail, UFO Universal Mid Clamp for XR Rails, EFO Universal End Clamps for XR Rails, and the Slotted L Foot.. The result is a very stout installation. Correct, the Renogy panels side by side are too wide for Gemini mounts.That looks interesting! How sturdy is the xr100 connection to the Gemini mounts? Would love any more pictures of how the XR100 rail is mounted. I assume the two panels side by side are too wide to mount to the factory cross bar using just the Gemini mounts?
Hello,
For anyone that has upgraded their solar panel, do you still have a working factory panel you would be willing to part with?
If so please PM me.
Thanks.
Tugnuts.com is the community hub for Ranger Tug, Cutwater, and Solara owners. Since its inception in 2008, the Tugnuts forum has grown into an active and thriving community of more than 9,000 members. It serves as both a meeting place for the best boating community online, and an invaluable archive of information.