Markl
Active member
- Joined
- Nov 27, 2016
- Messages
- 29
- Fluid Motion Model
- C-26
- Hull Identification Number
- FMLR2506F011
- Vessel Name
- No name yet... Coming soon
Hi all
I am about to install a solar panel on a 2011 Ranger Tug 25 and am looking for any ideas of how to run the wires from the panel down to the cave which seems to be an ok location for the controller. Looks like the text book route is through the back of the stack, then head starboard to the wire race that heads down by the sink then back to the engine compartment following the cabin heater water hose. Great in theory but looks like I have to disassemble half of the boat to accomplish this.
Any other idea's would be appriciated
Thanks
Mark
Note: installing a 60 cell residential grade panel rated at about 280 watts and a MPPT controller hoping to get enough stored energy to run the fridge through the night.
I am about to install a solar panel on a 2011 Ranger Tug 25 and am looking for any ideas of how to run the wires from the panel down to the cave which seems to be an ok location for the controller. Looks like the text book route is through the back of the stack, then head starboard to the wire race that heads down by the sink then back to the engine compartment following the cabin heater water hose. Great in theory but looks like I have to disassemble half of the boat to accomplish this.
Any other idea's would be appriciated
Thanks
Mark
Note: installing a 60 cell residential grade panel rated at about 280 watts and a MPPT controller hoping to get enough stored energy to run the fridge through the night.