captstu
Well-known member
- Joined
- Nov 10, 2014
- Messages
- 862
- Fluid Motion Model
- C-248 C
- Vessel Name
- Shearwater IV (SOLD)
Hi, I drystack my new (for me) R25. Prior to entering the dry stack marina, I must take down the RADAR mast to clear a fixed bridge. I also have to take it down to meet the height restrictions of the dry stack.
The mast is really a bit to heavy for me - quite a struggle to take it down and put it up each time.
I was thinking of having the pipe cut down just above the shelf above the radar shelf - and relocating the anchor light to the new "top" shelf.
Ideas?
Alternately, I was considering having the mast fabricated in aluminum just to hold the radar and anchor light.
Thanks for your thoughts. /Stu
The mast is really a bit to heavy for me - quite a struggle to take it down and put it up each time.
I was thinking of having the pipe cut down just above the shelf above the radar shelf - and relocating the anchor light to the new "top" shelf.
Ideas?
Alternately, I was considering having the mast fabricated in aluminum just to hold the radar and anchor light.
Thanks for your thoughts. /Stu