oldteaman
Member
- Joined
- Aug 18, 2015
- Messages
- 13
- Fluid Motion Model
- C-24 C
- Non-Fluid Motion Model
- Cutwater 30 CB
- Vessel Name
- Kerb Appeal
We recently moved from a Cutwater 28 to a Cutwater 30 with a command bridge (love it). We use our boats year round but expect to spend most of our winter trips in the cabin. For those that have Command bridges (Ranger and Cutwater) what preparation steps (if any) do you take to protect the instruments and furniture on the Fly bridge . for instance we did add a Bimini, do we leave that up or collapse it for the winter?
Terry
Terry