Dcsqatar
Well-known member
- Joined
- Dec 11, 2018
- Messages
- 106
- Fluid Motion Model
- R-29 S
- Vessel Name
- Beautiful Red
- MMSI Number
- 338348082
I am preparing to winterize my R29S for the first time. She will be staying in the water at Gig Harbor, WA but will not leave port for probably 4 months. I have gathered a lot suggestions on steps to take but can’t seem to find a recommendation on how full, or not, to leave my diesel tank. I am currently at about 1/3 full and have a choice to fill it or not before leaving for the winter. Any suggestions?