Brian John
Well-known member
- Joined
- Aug 17, 2023
- Messages
- 244
- Location
- Kilmarnock, VA
- Fluid Motion Model
- R-31 CB
- Vessel Name
- Shutter Speed II
While winterizing the HVAC units on our R-31 CB 2022, I noticed the drains on the port side do not correspond to the R-31 manual. They are shown as 3-Forward AC, 4-Aft AC, 5-Head Sink Drain 6- Shower Sump, 7- Maceraator.
What I have is 3-Head Sink Drain, 4-Forward AC, 5-Aft AC 6- Shower Sump (did not check as was winterized), 7- Macerator. (did not check).
Was this a change in layout by Fluid Motion or an error in manufacturing?
Lastly
For owners with an R31 2022 (maybe earlier or later) how do you winterize the HAVC, washdown, and generator with the Sherwood strainers with a basket facing down?
What I have is 3-Head Sink Drain, 4-Forward AC, 5-Aft AC 6- Shower Sump (did not check as was winterized), 7- Macerator. (did not check).
Was this a change in layout by Fluid Motion or an error in manufacturing?
Lastly
For owners with an R31 2022 (maybe earlier or later) how do you winterize the HAVC, washdown, and generator with the Sherwood strainers with a basket facing down?
Last edited: