River Bank
Well-known member
- Joined
- Apr 27, 2013
- Messages
- 115
- Fluid Motion Model
- C-248 C
- Vessel Name
- RIVER BANK
My 2010 R25 is currently having the bottom painted and zincs replaced.
I can only see three zincs that are being replaced, one on each of the "trim tabs" and one on the "main prop" hub.
Shouldn't there be more? On the hubs of front and stern thrusters for example?
Bob
I can only see three zincs that are being replaced, one on each of the "trim tabs" and one on the "main prop" hub.
Shouldn't there be more? On the hubs of front and stern thrusters for example?
Bob