Thetford Tecmar EasyFit ECO series electric head

Our fresh water Thetford Tecmar EasyFit ECO series electric head has now been installed. It works and 1st mate says it's wonderful. :) It took some 7 hours to install. Hardest part was snaking the electrical lines from the forward 12v breaker panel to the head compartment. Wires were pulled through a hole cut in floor of cubby under sink in head room. (see photo) Installing a new circuit breaker in the 12v circuit breaker panel is a dog as the complete bus bar has to be loosened just to insert a new breaker. The original raw water hose was capped off with a stopcock valve. This was done to allow a raw water pickup for some other use later on. The fresh water was teed off with a 90 deg elbow using PEX tubing attached to cold water line under sink in head room. (see photo) A small bus bar was installed under the sink in the head room to gather and connect all the wires nicely/neatly. (see photo) A 40amp circuit breaker was used although I could have got by with a 30amp. (see photo) A small two position rocker switch operates a quick flush or fill bowl with water and then quick flush.

Navigation


Browse albums Search Photos Add Photos
Thetford Tecmar EasyFit ECO series electric head

Thetford Tecmar EasyFit ECO series electric head

  • Album owner baz
  • Date created Apr 16, 2014
  • Items 5
Back
Top